ZweigWhite CE News Structural Engineer Rebuilding America's Infrastructure  
 
SEARCH  GO

Latest News
Fluidized bed reactor removes nitrates from groundwater at San Diego Mission Valley Terminal 

KINGWOOD, TEXAS — Envirogen Technologies, Inc., announced the successful start-up and operation of a fluidized bed reactor (FBR) system to remove nitrates from contaminated groundwater at Kinder Morgan Energy Partners’ Mission Valley Terminal in San Diego. The 0.5-million gallon-per-day (MGD) system is designed to provide a final treatment step for impacted groundwater pumped from an aquifer located beneath the city’s Qualcomm Stadium, prior to direct discharge to the watershed. The Envirogen FBR system differs from conventional denitrification technology in that it does not create waste by-products that require further treatment. Biological treatment is a more sustainable approach for addressing denitrification and can handle high levels of nitrates cost effectively.

According to Todd Webster, Ph.D., director of the Western Region for Envirogen, the system represents another high-efficiency “green” technology solution for reliable, cost-effective water treatment. “Our FBR technology differs from other denitrification processes in that it completely destroys nitrate, unlike phase transfer schemes, which generate waste by-products requiring further treatment,” Webster said. “While the FBR is an excellent ‘green’ treatment alternative, it is also a robust and cost-effective technology that can be designed into a very tight footprint and handle both low and high concentrations of nitrates. This made it the best solution to the full range of needs at this site.”

Envirogen’s FBR systems are fixed-film bioreactors in which sand or carbon media is suspended, or fluidized, within the reactor vessel by the upward flow of water through the system. The suspended media provides a large surface area for microbial growth and allows a biomass density several times greater than that of other bioreactor designs under similar loading conditions. Microorganisms in the reactor completely consume influent nitrates under anoxic conditions, reducing them to carbon dioxide, water, nitrogen gas, and additional biomass growth.

The Mission Valley Terminal FBR installation, operated by Kinder Morgan, is designed to handle flow rates of 350 gallons per minute from multiple wells and reduce influent nitrate levels of 4 mg/L to <1.0 mg/L nitrate. Envirogen Technologies provided system design and manufacture — including vessels, peripheral equipment, media, and microbial innoculant — along with installation oversight and additional process control/integration support. The system is largely self-regulating, requiring minimal operator attention and is capable of handling both hydraulic and organic shock loads. A chemical feed assembly automatically delivers a concentrated form of acetic acid as an electron donor to the system as required. The system effluent is sent through a post-aeration step to increase dissolved oxygen prior to discharge to Murphy Canyon Creek in accordance with a National Pollution and Discharge Elimination System (NPDES) permit.

According to Webster, extensive experience with this and other water treatment technologies allows Envirogen to craft ideal solutions to a broad range of treatment requirements. “At Envirogen, we understand how critical it is for today’s water treatment concerns — in both the industrial and municipal sectors — to meet stringent regulations economically and dependably,” Webster said. “We approach each challenge with a full toolbox of high-performance technologies, process design expertise, and an eye toward low-cost, reliable and environmentally sustainable treatment solutions. In addition, our flexible technology+services business model is designed to help implement and support those solutions, offering all of our customers the best fit for their treatment needs at a low lifecycle cost.”

For more information, visit www.envirogen.com.

Related Engineering Channels




Headlines From Around The Web

Paved, but Still Alive (New York Times)
Blog: Panama Canal Expansion: A Game Changer (Transportation Issues Daily)
Plans envision Pittsburgh 'Aerotropolis' (Pittsburgh Business Times)
GAI Consultants Makes Acquisition (Inside Indiana Business)






Current Issue


Exclusive

Civil engineering industry outlook - Part 1

While 2011 didn't offer too much progress in an economic turnaround, it seems that many people in the architecture, engineering, planning (A/E/P) and environmental consulting industries are adjusting to challenges. For 2012, increased stability is expected, although large changes don't seem likely.


New & Noteworthy


Progressive Engineering


Editor's Comment


ZweigWhite Upcoming Events

Environmental Connection 2012
Date: February 26, 2012 - February 29, 2012
Location: Las Vegas

Principals Academy
Date: March 8, 2012 - March 9, 2012
Location: Ft. Lauderdale FL

Geosynthetic Reinforced Retaining Wall Failures and Their Remediation
Date: March 13, 2012 - March 13, 2012
Location: Folsom PA

2012 Sustainable Water Management Conference
Date: March 18, 2012 - March 21, 2012
Location: Portland OR

Ninth National Conference on Transportation Asset Management
Date: April 16, 2012 - April 18, 2012
Location: San Diego


Events