ZweigWhite CE News Structural Engineer Rebuilding America's Infrastructure  
 
SEARCH  GO

Latest News
CH2M HILL and the City of Clovis celebrate the opening of a new water reuse facility 

DENVER — CH2M HILL has announced the opening of an innovative design-build-operate wastewater treatment/water reuse project developed in partnership with the City of Clovis, Calif.

The City of Clovis Water Reuse Facility will relieve the demand on underground and surface water supplies and will provide recycled water for irrigation of agricultural operations and urban landscaping throughout the City. Using recycled water for these purposes, rather than the traditional water supply, saves millions of gallons of drinking water and protects vital underground supplies — increasingly important as the region’s population continues to grow, the company said.

“Clovis partnered with CH2M HILL to build this facility with innovative technology, which makes it a great neighbor, provides recycled water at a low life-cycle cost,” said Steve Patterson, P.E., principal project manager for CH2M HILL. “The City of Clovis Water Reuse Facility is a great representation of the commitment the City has shown to the environment and its citizens, and it is a great model for other communities who are grappling with issues of surface and/or groundwater shortages.”

The 2.8 million-gallon-per-day (mgd) plant uses low-pressure, high-output ultraviolet lamps for disinfection that require one-third the amount of energy compared to other ultraviolet options. Membrane bioreactors provide the opportunity for better automation, reduced facility size and treatment performance. Additionally, the patented Cannibal sludge reduction system will reduce the amount of biosolids significantly and is the largest application of the technology to date in California.

The design-build-operate contract was a departure from Clovis’ normal customary procurement method. The single-source alternative provided the City an innovative solution at a competitive price. CH2M HILL will operate the facility for 10 years. Second and third phase expansions will increase the daily capacity to 8.4 mgd.

Other noteworthy features include reduced physical presence, advanced odor treatment, landscaping and prairie-style architecture to create a neighbor-friendly treatment plant.

For more information about CH2M HILL, please visit www.ch2mhill.com.
 

Related Engineering Channels




Headlines From Around The Web

Paved, but Still Alive (New York Times)
Blog: Panama Canal Expansion: A Game Changer (Transportation Issues Daily)
Plans envision Pittsburgh 'Aerotropolis' (Pittsburgh Business Times)
GAI Consultants Makes Acquisition (Inside Indiana Business)






Current Issue


Exclusive

Civil engineering industry outlook - Part 1

While 2011 didn't offer too much progress in an economic turnaround, it seems that many people in the architecture, engineering, planning (A/E/P) and environmental consulting industries are adjusting to challenges. For 2012, increased stability is expected, although large changes don't seem likely.


New & Noteworthy


Progressive Engineering


Editor's Comment


ZweigWhite Upcoming Events

Environmental Connection 2012
Date: February 26, 2012 - February 29, 2012
Location: Las Vegas

Principals Academy
Date: March 8, 2012 - March 9, 2012
Location: Ft. Lauderdale FL

Geosynthetic Reinforced Retaining Wall Failures and Their Remediation
Date: March 13, 2012 - March 13, 2012
Location: Folsom PA

2012 Sustainable Water Management Conference
Date: March 18, 2012 - March 21, 2012
Location: Portland OR

Ninth National Conference on Transportation Asset Management
Date: April 16, 2012 - April 18, 2012
Location: San Diego


Events